QUALITY ASSURANCE PLAN FOR
PIPE
|
Sr. No.
|
Stages Of Inspection
|
Inspection By Third Party /
Client's Representative
|
I.
|
RAW
MATERIAL IDENTIFICATION
and Check testing
|
Putting
stamps on identified Pipes and Samples and sending samples to Govt. approved
Lab.
|
|
Dimensional
& visual checking
|
At random
or as desired by third party Inspector / By client's representative &
verification of Manufacturer's test Certificate
|
|
Chemical
Analysis
|
Witnessing
of Tests & verification of Test Report
|
|
Physical -
Tensile Test & Micro Test
|
Witnessing
of Tests & verification of Test Report
|
II.
|
Acceptance
of Materials
|
Putting
final identification mark on Pipes and issuing of Despatch Clearance
Certificate
|
QUALITY ASSURANCE PLAN FOR WELDED PIPES
|
Sr. No.
|
Stages Of Inspection
|
Inspection By Third Party /
Client's Representative
|
I.
|
RAW
MATERIAL IDENTIFICATION and
Check testing:-
|
Putting
Stamps on identified Raw materials and samples and sending samples to Govt.
approved Lab
|
|
Dimensional
& Visual checking
|
At random
or as desired by Third Party Inspector / By client's representative
|
|
Chemical
Analysis
|
Witnessing
of Tests & Verification of Test Report
|
|
Physical :
Tensile Test & Micro Test
|
Witnessing
of Tests & Verification of Test Report
|
|
Stamp
Transferring
|
Only if
test conforms to your specification
|
II.
|
Submission
of : WPS
PQR
|
Approved by
Third Party / Client.
Witnessed by Third Party Client
|
|
WELDERS
PERFORMANCE TEST
|
Verification of Approved Lab Test Certificate
|
|
Filler Wire
/ Welding Rod
|
Chemical
Analysis to be carried out /M.T.C. to be verified
|
III.
|
D. P. Test
(a) 100 % Root Run
(b) 100 % Final Weld
|
To be
witnessed by Inspector
|
|
Radiographic Examination for 10% Weld joints or as desired by Customer /
Inspector
|
X- Ray
Films and Test Reported to be verified
|
|
Hydro Test
(On Random samples)
|
Test
reports to be verified
|
|
Pickling
and Passivation
|
Report
shall be submitted to Inspector
|
IV.
|
Tensile
Test on the welded portion, Micro Test on The weld effected area
|
To be
witnessed and Reports to be verified
|
|
Flattening
Test of finished pipe
|
To be
witnessed and Reports to be verified
|
V.
|
Final
Inspection
|
Dimensional
check & Visual Inspection
|
VI.
|
Acceptance
of Materials
|
Putting
final acceptance mark on the materials and
etching / stenciling and issuing of / dispatch
Clearance Certificate
|
QUALITY ASSURANCE PLANS
FOR 2 HALVES WELDED PIPE FITTINGS FOR STAINLESS STEEL, ALLOY STEEL & CARBON
STEEL
|
Sr. No.
|
Stages Of Inspection
|
Inspection By Third Party /
Client's Representative
|
1.
|
RAW
MATERIAL : Identification and
Check testing
|
Stamping on
identified Raw Materials and samples and sending samples to Govt. approved
lab
|
2.
|
DIMENSIONAL
& VISUAL CHECKING
|
At random
or as desired by Third party inspector / by client's Representative
|
3.
|
CHEMICAL
ANALYSIS
|
Witnessing
of Tests & Verification of Test Report
|
4.
|
PHYSICAL :
Tensile Test
Micro Test
|
Witnessing
of Tests & Verification of Test Report
|
5.
|
STAMP TRANSFERRING TO TEMPLATES
|
Only if the
Tests confirms to order specifications
|
6.
|
SUBMISSION
OF : WPS
PQR
|
Approved by Third Party / Client Witness by
Third party client
|
7.
|
WELDERS
PERFORMANCE TEST
|
Verification of Approved Lab Test Certificates
|
8.
|
FILLER WIRE
/ WELDING ROD
|
Chemical analysis to be carried out / M.T.C. to
be verified
|
9.
|
D. P. TEST
(a) 100 % Root Run
(b) 100 % final weld
|
To be
witnessed by Inspector
|
10.
|
RADIOGRAPHIC EXAMINATION FOR 10 % WELD JOINTS OR
AS DESIRED BY CUSTOMER / INSPECTOR
|
X - Ray
films and Test Report to be verified
|
11.
|
Tensile
Test on the Welded portion Micro Test on the weld effected area
|
To be
witnessed and reports to be verified
|
12.
|
HEAT TREATMENT & SOLUTION ANNEALING
|
As desired
by client / Third Party Inspection Agency
|
13.
|
PICKLING AND PASSIVATION FOR S.S.
|
Report
shall be submitted to Inspector
|
14.
|
SHORT BLASTING, OILING / WARNISHING AND PAINTING
FOR A.S. & C.S.
|
Visual
Inspection
|
15.
|
MARKING
|
Etching /
Punching of size, sch, specn. & heat No.
|
16.
|
FINAL
INSPECTION
|
Dimensional
check & Visual inspection
|
17.
|
ACCEPTANCE
OF MATERIALS
|
Putting final Acceptance Identification Marks
and issuing of Despatch Clearance Certificate
|